Engineer Design-Build Program
Sequence of Events
Scope
of Services Specific for County Projects
Latest
Notes, Updates and Errata for Scope of Services
Link to ODOT's Design-Build Scope Manual
Section
100 of the 1997 ODOT Construction and Material Specifications
Example
of a Design-Build Package on a Former ODOT Project to View
Example
of the current Design-Build Package from Guernsey County
Note: This document is in
Word. When asked for a password, click Cancel
Ohio
District and LPA Contact Information
FAQ's
Are we allowed to modify the scope language?
Yes
Is Construction inspection reimbursable?
Yes
Is Construction Inspection reimbursable even if it is county personnel?
Yes
Can we use test piles instead of soil borings?
No - Must Provide soil borings in advance
Are we allowed to fast track the project - for example, build
the substructure while designing the superstructure?
Yes - The key is how the buildable units are
identified by the designer. Keep in mind the
substructure under construction may limit the design choices of the
superstructure.
What is the Advertisement period?
Three weeks minimum. Because the need to put
together a D/B team, six weeks are recommended.
What is the Pre-bid meeting in Section 2 used for?
The pre-bid meeting should be considered mandatory
and the date of the meeting should be put in the
advertisement. The meeting would cover the owner's expectations of
the design and construction and
allow questions form the D/B team. This ensures everyone is bidding
on the same concept.
What is the Post Award Conference in Section 8.5
used for?
To be sure the designer's concept of the design and
construction matches the counties concept.
Is a stream crossing investigation (flood plain
analysis) required on every bridge as stated in section 10.4?
Yes -
Minimum
Hydrology and Hydraulics (H &H) Requirements:
The plans for each bridge should include a site plan as per Section 202.1
of the ODOT Bridge Design Manual (BDM).
Part of this site plan is the H & H information as stated in
202.1.d. This requires some
basic hydraulics be checked for the bridge.
At a minimum the DBT should provide information as shown in the
following sections of the BDM:
Section
202.5; a, b, h, and i parts 1 and 2.
Further information regarding the Hydraulic Analysis may be found
in section 203.2 of the BDM.
If
you leave Section 10.6 Stream
Crossing Investigations (flood plain analysis) of our proposed Scope
of Services in your scope as is, there should be no problems with the
H&H information provided.
Can we ask for quantities even though Section 18.1
says we don't need them?
Yes, it is up to the county to decide how much they
want the plans to show the quantities. Use what
you think you need for inspection purposes.
How do I estimate a completion date?
Using the normal amount of the time for
construction for your type of project, and several months for
design time. The best time to bid the project is late fall or early
winter.
|
[ Calendar
of Events | Supporting
Members | CEAO
Contacts | Federal
Programs | Related
Links |
Information
| Conferences
| Design
Build | News &
Highlights | Home
]
Send comments and
questions to the Webmaster
County Engineers
Association of Ohio
37 West Broad Street
Suite 660
Columbus, Ohio
43215-4132
614.221.0707
614.221.5761 (fax)
Copyright © 2001,
County Engineers Association of Ohio
|